New: AI-drafted permits to work, and compliance packs ready for audits.
Governed AI, ready for audits

Hotel compliance and maintenance that acts before you have to.

propsec.app/dashboard
The PropSec dashboard across a four-hotel estate: what needs attention today, the open tickets and the jobs assigned to you
The same estate on a phone, in an engineer's hand

01 · See

The whole estate on one board

One ledger across every property you run, from Dublin to Munich. The building that needs you today is always at the top.

Estate Sorted worst first8 properties · 3 need attention
Compliance registerHZ
Lift thorough exam overdue
74%checks current
SLA ladderHH
RACF
Contained 08:12 · finish due01:48
Rooms out of orderVM
312 inspected, back on sale14:00
Contractor at the doorTW
Permit PTW-118
Insurance current
Gas Safe verified
Cleared to start · 09:12
Condition surveyKH
2.1NEN 2767
good condition
82%signed + sealed
Capital planMC
Chiller replacement2028
EnergyTL
kWh per room night−8%
Evidence packCW
sha256:9f2a…c41e
Sealed · exported today
Three years, one tapPDF + JSON
Fire safetyGas safetyWater & legionellaElectricalLiftsFood safetyAsbestosWorking at height

02 · Predict

The 2am callout, now a planned visit completed weeks ago

PropSec watches every asset's own history and flags the failure while it is still a quiet Tuesday-morning job, not a floor out of sale on a Friday night. The visit is proposed, never booked behind your back.

Chiller CH-02 · breakdown interval RISING FAILURE
failure bandtodayMayJunJulSep
4 breakdowns · 90 days38 rooms behind it Visit proposed · Tue 09:00 · awaiting approval

The only AI in hotel operations that asks first

AI proposalDRAFT

Bring chiller CH-02 service forward to this month

  • ·4 breakdowns in 90 days, interval shortening
  • ·Serves floors 3 to 5 · 38 rooms behind it
  • ·Same fault at 2am: an emergency callout and a floor out of sale
Nothing runs without approval
Dry run · last 30 daysPREVIEW
Would raise 1 predictive ticket (CH-02)
Would notify the property engineer and the area manager
Would move the next PPM visit from Oct to Aug
No changes made. A preview, not a run.
ApprovalAPPROVED
SO

S. Okafor · Area Manager

Mon 07:02 · from the phone, on the walk

Approve and run Reverse any step later
Audit trailON THE RECORD
  • 07:02:11 Automation approved · S. Okafor
  • 07:02:12 Ticket TKT-2214 raised · CH-02
  • 07:02:12 Provenance logged · model, inputs, prompt version

sha256:c7d1…88a2 · sealed at write · verifiable on demand

Anyone you hand the pack to can prove nothing in it was altered.

Export the evidence pack · ready for audits

For the people who run the building

PropSec speaks the language of hotel operations: PPM, fire doors, LOLER, the fire marshal at the door. It is the system your team will actually open on a Monday morning.

A facilities manager reviewing a maintenance checklist at a fire panel
The fire panel check · Tuesday 06:40 · on the record
Two hotel maintenance engineers doing a shift handover in a plant room
Shift handover · whoever is on next picks up exactly here

Every shift, on the same page

Handovers, checks and jobs land in one place, with the full history behind them. And it works where the signal does not: the field app logs in the plantroom and syncs when you are back in range.

A vibrant, design-led hotel lounge with guests relaxing

When the operation runs, the guest never sees the work

The fault caught early is a planned service visit, not a 2am callout, a room out of inventory and a review that follows you for months.

The platform

Captured from the product your team signs into, not a mockup deck.

See it live
Every property against every framework
propsec.app/documents
Tickets that get ahead of the guest
propsec.app/tickets
The whole estate, scored and ranked
propsec.app/analytics
Assets
Assets
Planner
Planner
Health and safety
Health and safety
Analytics
Analytics

All your jobs, in one system

Four groups, nineteen places to go, one source of truth.

Work

  • Tickets
  • Inspections
  • Planner
  • Projects
  • Site access
  • Lost and found
  • Conversations

Compliance

  • Health and safety
  • Documents and permits
  • Training

Estate

  • Assets
  • Stock
  • Procurement
  • Energy
  • Analytics

Platform

  • Properties
  • Users
  • AI activity
  • Settings

Run by operations teams across Europe

citizenM67 Pall MallThe LaLit London

Take back your time

Pick what your team does by hand today. Typical hours from pilot properties; estimates, not promises.

Properties3
22.5hours a week

146 working days a year, back on the building.

"The fire marshal asked for three years of records. I pulled the pack in under a minute." General Manager, London

Ready to know you are covered?

A short walkthrough on your estate, your compliance regimes and your assets. Twenty minutes. No sales pitch.